Smart Engineering Calculator
Size Your Sub-Station, Generator, Solar & BESS in Seconds
Enter your load or list your machines. We add a 25% safety margin and recommend standard capacities – then request an official technical estimate in one click.
| Machine / load | kW each | Qty | Hours/day |
|---|
Please enter a load greater than zero.
Includes a 25% safety margin. Standard transformer and generator ratings shown are the next available size above the design load. Solar estimate assumes about 4.5 peak sun hours and 80% system performance; BESS estimate assumes 90% usable depth of discharge and 95% inverter efficiency. These are indicative figures – our engineers confirm final sizing after a site load study.
Please enter kW, voltage and power factor.
3-phase: I = kW × 1000 ÷ (√3 × V × PF). 1-phase: I = kW × 1000 ÷ (V × PF). Use this as the starting point for breaker and cable selection; final cable size also depends on length, voltage drop and installation method.
Please enter current, voltage and power factor.
1 unit = 1 kWh. Power (kW) = √3 × V × I × PF ÷ 1000 for 3-phase, or V × I × PF ÷ 1000 for 1-phase. Assumes the current stays steady for the hours entered.
Get Your Quote
Request an Official Technical Estimate & Quote
Your calculator result is added automatically. An Olokan engineer will review it and contact you.